BANKINGRegional Hub
Class-A Electrical
HDFC Bank — Jhansi Hub
Heavy three-phase power distribution, redundant UPS rooms, precision data networking, ATM kiosk & security vaults.




Project Overview & Execution Scope
Serving as a major banking hub in Jhansi, this site required heavy-duty electrical infrastructure including dedicated 3-phase LT sub-paneling, chemical earthing pits, and high-speed data cabling for 40+ staff workstations.
Key Technical Deliverables
Installed dedicated 3-phase LT panel with dual changeover switches for generator supply.
Turnkey 24/7 ATM vestibule construction with toughened glass and security interlocks.
Chemical earthing matrix achieving resistance under 0.8 Ohms.
Technical Specifications Ledger
| Built-up Area | 4,600 Sq. Ft. |
| Electrical Load | 75 kVA 3-Phase |
| Earthing Type | Copper Bonded Chemical Earthing |
| Data Cabling | Cat-6A Structured Cable Grid with Fiber Backbone |
| ATM Vestibule | Fully Air-Conditioned Dual-Kiosk Chamber |